Puget Sound Solar Division EV Support in Contract with WA DES

Go Back To Recent Blog Posts
Jan 11, 2016

Puget Sound Solar Division EV Support has been chosen by the Washington Department of Enterprise Services to supply electric vehicle charging stations and installation services at discounted prices to the various Departments and agencies of the State, as well as any state, county, or local governments and school districts who are signed on to the Master Contracts Usage Agreement.  This contract is for two years plus renewal up to 2024 if it is being utilized, and the total value is estimated to be $4.5M. 

If your fleet is adding EV’s, if you have a public location where you would like to provide EV charging, or if you have employees who drive EV’s who need to plug in at work, we have many different products available and factory-trained installers who will make this important addition to your site painless and successful.EV Support has been active since 2010 and has installed over 600 charging stations to date.  Products offered through the EV Support catalog come from well-established manufacturers of proven equipment and systems including Chargepoint, Clippercreek, Efacec, and Aerovironment. For more information contact our EVSE Specialist Andrea Tousignant – sales@evsupport.com.

About The Author - Jeremy Smithson

Started Puget Sound Solar in 2001 with 30 years of construction contracting experience, and a desire to turn Seattle on to solar energy. Achieving NABCEP certification in 2004, Jeremy believes that our customers often follow a path similar to the one he took, starting out with solar daydreaming, then progressing to education on the subject, and eventually leading to action. In addition to leading the company he also does some teaching and speaking engagements about various aspects of solar energy, and experiments relentlessly with various solar, energy efficiency, and electric vehicle projects.

Other News

Go Back To Recent Blog Posts

Free Quote

    If you would like to expedite your free quote, please upload photos of your electrical bill, your electrical panel with the door open, and any plans or architectural renderings (if this is a new build).
    Note that the file size limit is 25MB.
    * What files are recommended to attach?
    If you would like to expedite your free quote, please upload photos of your electrical bill, your electrical panel with the door open, and any plans or architectural renderings (if this is a new build).
    Note that the file size limit is 25MB.